12: Test Manager

Command Purpose
adv Advance the mode of the CyFlex Test Scheduler.
alicat_massflow Manage communication with Alicat Scientific Mass and Volumetric Precision Gas Flow Controller to read and monitor gas flow data, including pressure, temperature, and flow rates.
ck Check gp_test specification
comptest Perform computations for CyFlex variables that have an evaluation expression associated with them and are unique to an instance of the Test Manager.
engine_start Launch the engine_start application from gp_test as an @AUXILIARY_TASK procedure.
exec_script Execute a specified script file in response to a start event from gp_test and return the script’s exit status to indicate success or failure.
fr sim Simulate the DI actions generated by a Cummins fuel scale.
gp_stop Send a “stop_test” event to the specified instance of the Test Scheduler
gp_test Run the Test Manager.
hold Hold the CyFlex test scheduler in its current mode.
idle Send an idle_mode event to the Test Scheduler to initiate idle mode.
nt Process a new gp_test specification.
release Release the test scheduler from a previously commanded hold.
release_gptest Set an event to instruct a specified gp_test instance to release its resources and exit.
stability Manage specifications in a gp_test procedure.
state_mon Perform actions to determine if the state of specified variables matches the state of specified values.
suspend Send a suspend event to the Test Scheduler to pause the current mode, optionally specifying the scheduler’s registered name.
vrbl_file_renum Renumber a Horizontal format FURBALL spec file.
vrbl_to_file Read or write variables to/from a file which is in a spreadsheet-like format.