allwork
Purpose:
-
Generate reports on test cell power generation and utilization based on specified time intervals and formats.
Enter:
-
allwork [interval = day|week|fin_week|month|fin_month|year]
[form = 1|2|3] [n = X]
Where:
-
interval
Optional. Specify one of the following time interval report options:
- day (default)
- week (Sun-Sun)
- fin_week (Mon-Mon)
- month (1st-end)
- fin_month (Financial month – 4 or 5 weeks)
- year
form
Optional. Specify one of the following report format options:
- 1 => sorted by test cell number
- 2 => sorted by power generated
n
Optional. Specify the number of intervals to report starting from the most recent and going backward.
Example:
-
allwork interval=fin_week form=2
Notes:
-
This program requires specific data files for operation and may exit if files are unavailable.