sevenday
Purpose:
-
Generate a facility-wide utilization report for the specified number of weeks using the given time interval.
Enter:
-
sevenday [interval=day|fin_day] [n=number]
Where:
-
interval
Optional. Specify one of the following time intervals for the report:
- day (midnight to midnight); this is the default
- fin_day (7am to 7am)
n
Optional. Specify the number of weeks to generate reports for. The default is 1.
Example:
-
sevenday interval=fin_day >/data/util/SEVEN_DAY_REPORT
Produces a report from the previous 7am back seven 24 hr intervals.sevenday > /data/util/x
Produces a report from the previous midnight back seven 24 hr intervals.
Notes:
-
This program relies on the existence of several data files, including /data/meters/occ/occ.log.NNN, when NNN is the test cell number.
For a more comprehensive description of the system requirements for utilization reports, see cyflex/admin/docs/utilization